
Mould and asbestos containment that stays clean
Washable, reusable panel enclosures for abatement, remediation and restoration crews. Up in hours, solid all job, and gone without a trace when you're done.
Up in hours, not days
Panels lock together on site. No framing, taping, mudding or painting, and no waiting for anything to dry.
Washes down clean
Smooth PVC faces wipe or wash down between phases and at the end of the job. Built for wet, high-moisture areas.
Holds the boundary
Sealed joints and fitted doors help your crew keep negative air and keep dust and spores on the work side.
Used again and again
Every square foot of panel keeps about 1.6 lb of single-use material out of landfill (the manufacturer's figure), job after job. The panels are recyclable PVC.
Why crews switch from poly and drywall
Every containment job ends with a clean-up. The material you pick at the start decides how hard that clean-up is.
| Feature | Poly sheeting | Drywall hoarding | NexaBarrier panels |
|---|---|---|---|
| Set-up time | Fast | Days, with finishing | Hours |
| Washes down | No | No | Yes |
| Stands up to water | Tears and sags | Soaks up water and feeds mould | Built for wet areas |
| Reusable | No | No | Yes |
| Looks finished to the public | No | Once painted | From day one |
| Doors and windows | Zippers | Framed in | Built into the system |
| Fire performance | Needs a flame-retardant grade | Non-combustible core | Tested to ULC S102.2 flame and smoke spread |
| Dust during install | Low | Cutting and sanding dust | No cutting on site |
| Cost | Lowest up front, redone every phase | Studs, board, paint and disposal | Comparable to drywall, and reused |
| Waste at the end | Bags of plastic | A bin of drywall | Panels go back on the truck |
What it looks like on a job





The details crews ask about
Fire tested
Panels tested by the manufacturer to ULC S102.2 for flame and smoke spread, rated Class A1. Results available for your project file.
No dust going up
Nothing is cut or sanded on site, so installing the wall doesn't add to the problem you're containing.
Priced like drywall
Comparable to studs, board, paint and disposal, without the finishing days, and the same panels move with each phase.
One complete system
Panels, channels, corners, bracing, doors, handles and locks all come from one kit, delivered, installed and removed by us.
Your plan, our walls
Send the work-zone drawings and your consultant's containment requirements. We lay out the enclosure, entries and decon rooms to match, install it, and move it as areas are cleared.
- Work-area enclosures of any size
- Entry, decon and staging rooms
- Ports for air-unit ducting
- Lockable doors and warning signage
- Phased moves as zones clear
We supply and install the containment walls. Your licensed abatement contractor runs the abatement, air handling, monitoring and clearance.

Who uses it
- Asbestos abatement contractors
- Mould remediation companies
- Restoration and insurance repair
- Environmental consultants
- Hospital and school facility teams
- Property managers
Common questions
Do you do the abatement work?
No. We supply and install the containment walls. Your licensed abatement or remediation contractor runs the abatement, air handling, monitoring and clearance. We build the enclosure to their plan.
How fast can you install?
A typical enclosure goes up in a single shift. Larger or phased walls are scheduled with you, including evenings and weekends.
Can the panels get wet?
Yes. The PVC panels are made for high-moisture areas and can be wiped or washed down.
Will it hold negative air?
With sealed joints and fitted doors, the enclosure supports the negative air your contractor sets up with their air units. Performance is set and checked by your contractor or consultant.
Is the system fire tested?
Yes. The manufacturer has tested the panels to ULC S102.2 for flame and smoke spread and rates them Class A1. Test results are available on request for your project file.
How does the cost compare?
On most jobs the cost is comparable to steel studs, drywall, paint and disposal, and you save the days of finishing. Phased jobs save more because the same panels move with the work.
Price your next containment job
Send the drawings or a description and the containment criteria if you have them. We'll come back with a layout and a price within one business day.
